High Point High School in Scio Twp. is a $1.8M sitework contract Verdeterre has with the Washtenaw County ISD. This new high school is being built on the site of the original school and integrates some of the original building into the new construction. The schools original pool is being renovated and kept as part of the new building. This site was low and required a significant amount of imported engineered fill. Verdeterre was fortunate to have just enough from previous projects to bring this site up to grade.