High Point High School

High Point High School

High Point High School in Scio Twp. is a $1.8M sitework contract Verdeterre has with the Washtenaw County ISD. This new high school is being built on the site of the original school and integrates some of the original building into the new construction. The schools...
13 Mile Road Re-Construction

13 Mile Road Re-Construction

The 13 Mile Road project was a job our team subcontracted from Ajax Paving Industries. Ajax was the prime contractor for this MDOT project and Verdeterre provided the soil erosion control measures, site demolition, earthwork, aggregate base and storm sewer. This...
Edsel & Eleanor Ford House

Edsel & Eleanor Ford House

This project consists of a new Visitors Center building and a new Administration Building at the historic Edsel and Eleanor Ford House, along with associated parking and walking trails, located on beautiful Lake St Clair. This is Verdeterre’s first project for Frank...
Midtown Pointe Apartments

Midtown Pointe Apartments

The project consists of 19 apartment buildings in addition to a clubhouse and pool area. Verdeterre performed tree removal, soil erosion installation, site and utility demolition, earthwork including all basement excavation and backfill activities, radon piping...
Home 2 Hotel and Suites

Home 2 Hotel and Suites

Atto Construction is a longtime client for Verdeterre, but this project presented some logistical challenges; mainly moving equipment and housing field team members. Verdeterre performed all earthwork and utility installation for the new 5-story hotel being...