Edsel & Eleanor Ford House

Edsel & Eleanor Ford House

This project consists of a new Visitors Center building and a new Administration Building at the historic Edsel and Eleanor Ford House, along with associated parking and walking trails, located on beautiful Lake St Clair. This is Verdeterre’s first project for Frank...
Midtown Pointe Apartments

Midtown Pointe Apartments

The project consists of 19 apartment buildings in addition to a clubhouse and pool area. Verdeterre performed tree removal, soil erosion installation, site and utility demolition, earthwork including all basement excavation and backfill activities, radon piping...
Home 2 Hotel and Suites

Home 2 Hotel and Suites

Atto Construction is a longtime client for Verdeterre, but this project presented some logistical challenges; mainly moving equipment and housing field team members. Verdeterre performed all earthwork and utility installation for the new 5-story hotel being...
Storypoint Senior Living Center

Storypoint Senior Living Center

The project required a significant amount of soil remediation due to perched groundwater and the poor soil characteristics of the existing clay and silt. Lime stabilizing was used to provide a stable base to place the 25,000-ton of imported sand required. This project...
Belleville High School

Belleville High School

Performed all site demolition, tree removal, earthwork, aggregate base installation, site utility installation and restoration for a new high school. The new school will be constructed at the site of the existing school. Students will continue to attend classes in the...